• 2016-04-11 PIP for Trout Creek Locker Remodel, RRF
  • 2016-07-19 Task Force Meeting Summary, Trout Creek Locker Remodel
  • 2016-07-23 approved PIP, TCRC locker room remodel
  • 2016-07-23 DP – TCRC Poolside TI – Permit request
  • 2016-08-18 DP to proceed with Trout Creek Pool-side Locker Remodel, Board approval received on Sept 3
  • 2016-09-20 Construction Field Report
  • 2016-11-10-construction-project-report-trout-creek-locker-room-remodel