Alder Creek Adventure Center North Lot Drainage Improvement Project

WHAT IS THE PROJECT?

The existing north parking lot adjacent to ACAC, including the ADA parking stalls, is north-facing and remains shaded for much of the winter season. In addition, the area does not drain properly, causing standing water to freeze during the winter months. This creates recurring ice accumulation within parking spaces and drainage facilities, resulting in path-of-travel challenges, increased maintenance requirements, and potential hazards for pedestrians.

The project proposes to regrade portions of the parking lot, improve and relocate drainage facilities, install snowmelt areas, and enhance facility access from the north parking lot.

The project will:

  • Improve access by providing a more direct connection from the North Lot to the patio and snow beach areas.
  • Improve operational access to the dumpster enclosure for waste collection.
  • Enhance pedestrian safety and winter accessibility by reducing snow and ice accumulation through improved drainage and snowmelt infrastructure.

WHAT ARE THE IMPACTS?

The project is substantially complete, and no additional impacts are anticipated.


WHAT IS THE PROJECT STATUS?

  • Project plans are complete
  • The board approved construction in the June 26, 2026, board meeting
  • Permit has been issued by the Town of Truckee
  • Construction is substantially complete; the contractor is wrapping up punch list items

WHAT IS THE TOTAL COST OR BUDGET?

  • Project soft costs and construction costs total $451,736.00

DOCUMENTS


HOW DO I PROVIDE FEEDBACK?



PLEASE NOTE: The Alder Creek Adventure Center North Lot Drainage Improvement Project is in development by Tahoe Donner Association. The information provided is preliminary and subject to change. Drawings and renderings herein are for conveying Tahoe Donner Association’s vision of future projects. No warranties, expressed or implied, are made.